Orange walk By-Pass, Belize.
Client:
The government of Belize.
Project Overview:
The
project scope comprised the construction of 7 kilometers of paved road
with 2 bridges. The embankments on the project required 290,000 cubic
meters of compacted fill material. The areas of cut required 60,000
cubic meters of excavation. The surface area of road surface was
200,000 square meters. The drainge package required the construction of
34 culverts.
Contract Value:
US $21.1m
Construction Schedule:
The commencement date for the project was during June of 2002 with a contrat duration of 18 months.
Services:
General Contractor.
|