Orange Walk Bypass, Belize

Project Name:
Orange walk By-Pass, Belize.

Client:


The government of Belize.

Project Overview:


The project scope comprised the construction of 7 kilometers of paved road with 2 bridges. The embankments on the project required 290,000 cubic meters of compacted fill material. The areas of cut required 60,000 cubic meters of excavation. The surface area of road surface was 200,000 square meters. The drainge package required the construction of 34 culverts.

Contract Value:


US $21.1m

Construction Schedule:

The commencement date for the project was during June of 2002 with a contrat duration of 18 months.