Project Name:
Image


St. Charles, Ocean Front Condominium, North Caicos.

Client:

Belvedere Development Limited.

Delivery Methodology:

Lump Sum Price Traditional Fidic / Johnston Form of Contract.

Project Overview:

Phase 1 of the project involves the construction of the first block of this 6 block ocean front condominium project on the island of North Caicos. Additionally Johnston International limited will be constructing the feature swimming pool, bar and beach access.

Image
Challenges:

The primary challenge for this project is with respect to the supply chain logistics. In particular the requirement to tranship all materials from Providenciales to North caicos on small shallow draft barges.

Contract Value:

US$ 6.6m

Construction Schedule:

The commencement date for the project was the 4 January 2005 with a contract duration of 12 months.

Estimate Methodology:

The contract was awarded on a negotiated cost plan basis.
Package Strategy:

Johnston as the main contractor is using its preferred supply chain partners as appropriate, with the emphasis on local suppliers.