Project Name:Leeward Landings Townhouses, Turks and Caicos.
Client: Leeward Landings Limited.
Delivery Methodology: Design and Build, in line with the Johnston International Limited standrd form of contract.
Project Overview:
The
project scope included the design and construction of the
first block of 4 number townhouses. The total scheme was
designed to contain 10 number blocks together with roads, sidewalks, a
tennis court and a large swimming pool. In addition to the
construction works the projct included landscaping nd irrigation
works.
Challenges:Contract Value: US $1m
Construction Schedule: The cntract commenced on the 16 February 2001 with a contract durationof 12 months. The project was delivered 6 weeks early.
Estimate Methodology:
Negotiated on an open book basis directly with the Client.
Package Strategy:
The
project was divided into two main subcontract packages the building
works and the services and supervised by a strong Johnston
International management team.